· Basic requirements: 380V power supply (±10%)
Level cement foundation (bearing capacity ≥800kg/m²)
Cooling water pipeline (DN65 interface)
· Installation time:
Hanging the whole machine in place: 1 hour
Water and electricity connection debugging: 4 hours