In the field of mechanical processing, the thermal stability of equipment and processes directly determines product accuracy, surface quality and production efficiency. Industrial chillers have become indispensable supporting equipment in the modern intelligent manufacturing system through precise temperature control and efficient heat dissipation, injecting “coolness” into key process links.
Pollution resistance: The plate heat exchanger is designed to prevent rust and deal with cutting fluid oil and metal dust environments.
Industrial reliability: IP65/IP55(customized) protection level, stable operation in a high temperature environment of 50℃ (such as a foundry workshop).
Energy efficiency ratio optimization: variable frequency drive technology, saving more than 40% energy under low load conditions.
Modular expansion: Supports parallel cooling of multiple devices to meet the needs of production line expansion.
Achieved PUE 1.15 by integrating their dry cooler with free cooling. EC fans cut noise to 68dB(A) – passed municipal audit 1000m from residential zone. Maintenance cost? 70% lower than evaporative towers.
Running 32°C mold temp ±0.3°C with Tekin’s chiller cut our ABS warpage scrap from 7% to 0.8%. Energy recovery pre-heats pellets – saving $18,000/month in Dongguan summer. Worth every penny.
ATEX-certified chiller on gas compressor stayed online during -35°C Siberian winter.
Cooling acrylonitrile reactor at -5°C with Tekin chiller. Zero downtime in 18 months vs. replacing 316SS exchangers quarterly. Corrosion warranty backed real data.
±0.5°C quench air control eliminated 0.7% ‘dumbbell’ PET fibers. AI predicts spin finish temp drift – saving $360k/year on off-spec material.
Quality is very good, excellent value for money.
Carbon footprint tracker proved 580 tons CO₂ reduction/year. Recycled titanium in heat exchangers got us tax credits under EU CBAM. Sustainability isn’t marketing fluff here.
· ±1°C (meets 90% of conventional applications)
· Need ±0.5°C? Optional upgraded chiller
· Need ±0.1°C? Optional upgraded chiller
· Basic requirements: 380V power supply (±10%)
Level cement foundation (bearing capacity ≥800kg/m²)
Cooling water pipeline (DN65 interface)
· Installation time:
Hanging the whole machine in place: 1 hour
Water and electricity connection debugging: 4 hours
· Standard model: +5°C to +35°C (ambient temperature ≤ 43°C)
· High temperature response: 85% cooling capacity retention at 43°C (better than the industry average of 75%)
⚠️ Tip: For environments above 43°C, we recommend that you choose a water-cooled chiller
· Free warranty: compressor/circuit board failure
· Cost charges:
Scale blockage (not cleaned regularly)
Rat bite circuit (no protective cover installed)
Voltage instability leading to board burnout (no voltage regulator installed)
Machine damage caused by human factors or force majeure environmental factors